Only one assembly stand occupied
|
DFBX-C complete and ready for the shipping frame
|
DFBX-C
|
Some questions have arrisen about the Circle Seal reliefs, so they are photo'd here on DFBX-C
|
Some questions have arrisen about the Circle Seal reliefs, so they are photo'd here on DFBX-C
|
DFBX-C connector tree wiring
|
DFBX-C electrical connectors
|
DFBX-H is the last box under assembly, delayed by a marginally low AMI corrector lead hipot.
|
Phil and Ed discussing DFBX-H
|
The lead cluster with voltage breakdown just below our requirement, on DFBX-H
|
The lead cluster with voltage breakdown just below our requirement, on DFBX-H
|
We need two more of the 90 degree connectors for HTS lead heaters
|