Dressed Cavity photos, DESY, June 2005

DSCN3302.JPG
Dressed cavity under prep for Chechia
DSCN3303.JPG
Dressed cavity under prep for Chechia
DSCN3427
Dressed cavity in tech shop after removal from Chechia, looking at input couper end.
DSCN3428
Dressed cavity after removal from Chechia with helium piping (above) and cavity vacuum piping.
DSCN3429
View of removed cavity from end.
DSCN3430
The small flex hose line is the helium cooldown line.
DSCN3459
Mangetic shielding on new assembly (cryoperm)
DSCN3471
Helium vessel support for Chechia
DSCN3472
Underside of helium vessel support table that travels with the dressed cavity into Chechia
DSCN3474
Helium vessel support for Chechia
DSCN3475
Underside of helium vessel support plate for Chechia
DSCN3476
Piezo tuner assembly
DSCN3477
Used magnetic shielding, removed from AC68 after Chechia test
DSCN3478
Used magnetic shielding, removed from AC68 after Chechia test


Legal Notices